Well we`ve worked for 29 hours straight on the EDF Conference and Awards night and it was a great success. We installed our Mobile club rig as a stage frame to save space in the cramped function suite and the visuals system worked perfectly with a mix of graphics going out to the 3 projection screens (one was a double stacked 8klumen rear projection wall) and twelve 50″ plasmas around the building.
Chris ran the sound desk Jamie was on lighting I did the presentation and production work and DJ Churchy was on the video console for the evening party. A great time had by all.
{mp4remote}http://www.yourperfectnight.co.uk/images/stories/edf/IMG_2017.MOV|250|160{/mp4remote}
{loadposition blogedf}